art barn
SAN MIGUEL COUNTY, ColoradO
Project details
ROLE: INTEGRATED DESIGN BUILD
Duration: 2005-2007
Client: Thomas + Lisa Hoeller, Munich Germany
Project Size: 2,500 sf
Project team
Project Design Builder: Project-Workshop: Rich Cieciuch, Principal; Dylan Henderson, Manager + Superintendent
Mechanical Design Build: GT Mechanical - Montrose, Colorado
Structural Engineer: Buckhorn GeoTech - Montrose, Colorado
PROJECT NARRATIVE
2,500-square-foot private residence/art studio on site at 9700’elevation. Program included 1,250 SF art studio and 1,250 SF residential quarters including master bedroom and bath with a sleeping loft. Building invites natural light, with full height doors opening to the wood terrace to provide indoor/outdoor experience. Finishes included massaranduba exterior rain screen, river rock veneer, polished concrete floors, rift cut white oak millwork.
innovations
The building was constructed utilizing prefabricated foundation walls set on gravel footings, prefabricated structural insulated wall and roof panels, and prefabricated CNC milled roof trusses.
Management responsibilities
In charge of all design and construction processes, including lead project design, program development, team building, development and management of overall budget and schedule; negotiation of all construction subcontracts, intensive value-engineering efforts to maintain budget and schedule goals construction sequence.